Requester: Chris Desousa and Brad Hoff
Request story: Brad stated “Chris and I discussed that we should only have ad hoc 24 and ad hoc 48 flags and nothing beyond 48 should be flagged as ad hoc loads”
Solution: Proposed to disable the DRS in MG which is calculating and adding the “Extra” value of “AdHoc48”. This would be without changing any other value.
In other words:
AdHoc24 Load creation date/time is <= 24 hours form date/time of target ship early
Added care of a dynamic ruleset in MG at the time of load creation. Not available for manual entry
Keep as is
AdHoc48 Load creation date/time is > 24 hours and <= 48 hours form date/time of target ship early Added care of a dynamic ruleset in MG at the time of load creation. Not available for manual entry
Keep as is
AdHoc60 Load creation date/time is > 48 hours and <= 60 hours form date/time of target ship early Added care of a dynamic ruleset in MG at the time of load creation. Not available for manual entry
Remove from the dynamic Ruleset, and not to avail for manual entry either
AdHocREC Recovery AdHoc requested/imposed by carrier (internal or 3rd party) To be added manually by user in the appropriate circumstance
Keep as is
Snowflake Changes: This request imposes no change to the TMS tables in Snowflake. However it changes the meaning of Ad Hoc. Any load created in the 48 hours before a Load’s target ship early is not considered Ad Hoc.
MG support case has been processed.
Also stakeholders and internal clients informed of upcoming changes
Support case # 00061045 raised with MG to "Disable DRS for AdHoc60"
Back in February 2021 Geno Schwartz had setup a dynamic rulesets to add load level reference values.
I believe it must be at Pitney Bowes TMS Admin or PB Commerce Services Transportation level.
One of those was a DRS to add or update the reference "Extra" with value of "AdHoc60" to load if
48< (load create date vs target ship early) <=60 .
We need to deactivate that one DRS, without changing or affecting others.
I do not have the OID for that DRS !
Please apply the same change in Prod and QA. We want them in sync.
the DRS condition must be: